Santa Rita Computing

15 MW live in Big Lake, Texas

AI capacity, already energized.

An operating West Texas site, converting to AI capacity with a path to 25 MW.

Services

Capacity for AI training and inference, from the first 5 MW to a 25 MW campus.

  • AI data center capacity

    Power, space and cooling for large AI deployments, with customers bringing their own hardware. Capacity converts in phases, starting with the first 5 MW, toward a 25 MW campus.

  • Investment and partnership

    On-site diligence, a review of power, land and network, and a path from proof-of-concept budget to term sheet.

About Us

Santa Rita Computing is converting an operating site in Big Lake, Texas into an AI data center campus. The interconnection is done, fiber is on site, and the next 10 MW is already in the queue.

15 MW live.
10 MW queued.

A 13.8 kV feed is already on the pad, and transformers T1 to T8 feed zones separately. Another 10 MW is in the interconnection queue, targeted for Q3 2027.

  • 25 MWPlanned campus, 2027
  • 13.8 kVFeed on site
  • 8Transformer zones
  • 15 acresWith room to expand

Why this site.

15 MW is not a drawing. It is load that is billed and running today.

  • Power you don't wait for

    The full 15 MW is interconnected and billed today. There's no greenfield substation to permit or build before the first racks go in.

  • A path to 25 MW

    Another 10 MW is already in the utility's interconnection queue, and will be built to AI specification from the start.

  • Infrastructure in place

    Eight pad-mounted transformers each feed their own zone. Pads sit beside the load, so feeder runs are short and isolation is fast.

  • Fiber on the pad

    Fiber is connected today. A second route or satellite backup can be layered onto the existing last mile.

  • Air or liquid cooling

    The dry climate suits evaporative and dry coolers, and closed-loop liquid cooling can run on well water with municipal makeup.

  • Room to grow

    Fifteen acres with offices, workshops, a warehouse and staff housing, plus space for expansion, backup generation or storage.

Converting in phases, without going dark.

Each phase is sized to signed demand. The existing operation keeps running while capacity moves over to AI.

  1. Today

    15 MW at full load

    The site runs at full load while diligence validates power, network, operations and land title.

  2. Phase 1

    First 5 MW for AI

    Freed for proof-of-concept AI racks, with refreshed power distribution, fiber and monitoring.

  3. Phase 2

    Conversion to demand

    Remaining zones convert against signed customer demand, starting nearest the transformers and fiber.

  4. Phase 3, 2027

    25 MW campus

    The new 10 MW is built to suit from day one, joining the converted site as one campus.

Contact

Planning a large AI deployment, or looking to invest or partner? Start the right conversation.